Vibration plate installation steps

1. When opening the package, check whether the whole machine and accessories meet the packing list.
2. Check if the fasteners in the main parts of the main unit are loose.
3. A certain gap should be left when the vibration plate outlet is connected with the corresponding parts to avoid affecting the function of the vibration plate.
4. When installing, make sure that the damping element is in the corresponding hole above and below.
5. After the height and level of the vibrating plate are adjusted, fasten the lower seat to the bracket or the fixing plate.
6. The gap between the electromagnet and the armature and the elastic components have been adjusted before leaving the factory. Under normal circumstances, it is not necessary to adjust.
7. The vibrating plate is equipped with an electrical plug on the electrical control box (Note: the electric control box must be waterproof and oil proof)
8. Before turning on the power, be sure to adjust the potentiometer to the minimum value to avoid damage to the thyristor.
9. Turn on the 220V or 110V power supply, turn on the switch, slowly turn the potentiometer, and gradually reach the required number of feeds.
10. After two years of normal operation of the vibrating plate, the parts of the chassis should be disassembled, and the dust and dirt on various parts should be cleaned, reassembled and debugged to achieve the required number of feeding.